No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. EL EMUNAH - 02.069.119.2-922.000 | 100,0 | 100,0 | 80,5 | Rp. 197.780.000,00 |
Rp. 197.780.000,00 |
100,0 | 84,4 | |||||||||
2 | PT. SIARPLAN UTAMA KONSULTAN - 01.475.355.2-922.000 | 72,3 | 72,3 | 84,4 | Rp. 201.119.600,00 |
Rp. 201.119.600,00 |
98,34 | 87,19 | |||||||||
3 | CV. Sains Group Consultan - 01.600.835.1-922.000 | 85,8 | 85,8 | 87,39 | Rp. 205.001.500,00 |
Rp. 205.001.500,00 |
96,48 | 89,21 | |||||||||
4 | PT.KONINDO PANORAMA KONSULTAN - 82.518.194.4-922.000 | 85,6 | 85,6 | 87,38 | Rp. 205.797.460,00 |
Rp. 205.797.460,00 |
96,23 | 89,22 | |||||||||
5 | PT. DECONT MITRA CONSULINDO - 01.970.594.6-922.000 | 89,7 | 89,7 | Tidak Hadir pada saat pembuktian kualifikasi | |||||||||||||
6 | CV. Irsyadi Consult - 03.029.986.1-922.000 | 43,7 | Nilai Hasil Evaluasi Kualifikas tidak memenuhi Passing Grade | ||||||||||||||
7 | CV. HASTA PERKASA Engineering - 73.913.490.6-922.000 | 85,1 | 85,1 | Tidak hadir pada saat pembuktian kualifikasi | |||||||||||||
8 | CV. INDO DESIGN KONSULTAN - 02.537.065.1-922.000 | ||||||||||||||||
9 | CV. Putra Timor Raya - 01.998.203.2-922.000 | ||||||||||||||||
10 | CV. EKKLESIA - 71.949.775.2-926.000 | ||||||||||||||||
11 | PT. SKALA PILAR LIMA - 84.711.828.8-646.000 | ||||||||||||||||
12 | PT INDOTEC TIGA PUTRA - 01.600.827.8-922.000 | ||||||||||||||||
13 | CV. INDO PLANNO - 03.209.069.8-922.000 | ||||||||||||||||
14 | CV. JOSHUA ENGINEERING - 75.273.907.8-922.000 | ||||||||||||||||
15 | CV. KUKUH ABADI - 01.600.884.9-922.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak